Home / Solar for new builds
Solar for new buildsBuilding a new home? Plan the solar now.
Planning solar while your home is being designed means cleaner cabling, the right switchboard space and a roof layout made for panels.
Ready for solar from day one.
When solar is part of the build, the cables run inside the walls during framing, the switchboard has room for the inverter and isolators, and the roof layout suits the panels.
We work with your builder and fit around the programme, so solar is one less thing for you to manage. It suits the new subdivisions in Rolleston, Lincoln, Prebbleton, Rangiora and Kaiapoi especially well.
SiteWise Green accredited.

Four steps, fitted to the build.
Plans review
We look at your plans and recommend a system size and roof layout.
Pre-wire
Cables run during framing, before the linings go on.
Panels on
Panels are fitted once the roof is on, in line with your builder’s programme.
Connected
We lodge the lines company application and commission the system at completion.
Questions, answered plainly.
As early as possible, ideally while the plans are being finalised, and before framing starts.
Yes. We talk to your builder directly about the cable runs, roof layout and timing.
Yes. We can leave space and cabling for a battery so it is simple to add later.
Find out what solar would do for your home.
Tell us about your home and we will arrange a free solar assessment, then send a fixed price and a savings estimate.
